In 2020 we completed the foundation of the Port Authority of Gourmalon, located in Pornic (44). This structure, located by the sea, needed reinforced protection against corrosion. About thirty piles were installed on the ground to allow the construction of a reinforced concrete entanglement, and then the building.
